↓ Skip to main content

Video 9 min

Using GitHub Issues for Decisions and Project Management: Alan's Method, With a Template

How Alan replaces most meetings with written GitHub issues: when a decision earns an issue, the LOCI roles, the writing rules, an issue template you can drop into .github/ISSUE_TEMPLATE, and when to add a GitHub Project on top.

Narrated in English Subtitles: English, 日本語, 한국어, Tiếng Việt, 简体中文

Transcript

The meeting starts late. Nobody has come prepared. And the loudest voice in the room wins, whether it's right or not. An hour later, you're more confused than when you walked in. And you're wondering if there's any paracetamol left in the drawer.

One company stopped booking that meeting. Instead, they open a GitHub issue, and argue it out in writing.

I keep coming back to the way they make decisions. The company is Alan, a French health insurer. Now that I'm managing a team myself, I've been taking proper notes on their system.

First, they tried fixing meetings. Fifteen minutes at most. A clear agenda. A decision required. It didn't hold.

Discussions drifted. Nobody could remember what was said. And anyone absent or remote was simply out of luck. So they moved the whole thing into writing. Their claims for it ring true to me.

Writing forces you to slow down and actually think, so the discussion gets more nuanced, and better argued. Everything is documented, not half-remembered. It stops being an eloquence contest. And anyone in the company can contribute, not just whoever happened to be in the room.

The forum is GitHub. A platform built for code review, which Alan cheerfully hijacked. The setup is almost embarrassingly simple. An account. A private repo with no code in it.

Labels to sort the conversations. And the Issues tab. Open issues are live discussions. Closed issues are decisions made. They've passed seventeen thousand issues.

That's a lot of meetings that never had to happen. But the part I find most appealing is the history. If you want to challenge an old decision, you can first read which arguments won last time. Not every decision earns an issue. Their filter is four questions.

Who will be affected? How reversible is it? How urgent is it? And do I need more context before deciding? Broadly, high-impact, hard-to-reverse decisions go to the forum.

The rest can stay in Slack. They lean on one-way and two-way doors. A one-way decision is too painful to reverse, like a price increase. That gets the full written treatment. A two-way decision is cheap to undo.

Worst case, you lose some energy. It doesn't need the ceremony.

Every discussion assigns roles: Lead, Owner, Consulted, Informed. They call it LOCI. The Lead is accountable for the decision's success. One per discussion. They say upfront how involved they want to be, then trust the Owner, and speak up only when they strongly disagree.

The Owner makes the final call. One Owner per decision. They investigate the problem, keep contributors on time, open and close the issue, and share the decision. If they hit a wall, they go to the Lead. Consulted people are the ones whose input genuinely matters.

They answer promptly, even if only to say "nothing to add". And they raise the alarm if the decision looks badly wrong. Alan caps that group at about six. More input starts costing schedule. Informed people simply get told, usually once the decision is made.

Nothing is expected back. That works decision by decision. For a whole project, I write it down once, as a project communication plan. Who needs to hear what, how often, and who tells them.

Every issue uses the same template. It sharpens the thinking. And it quietly teaches junior people how to break a problem down. It starts with scope, the why of the discussion. Including an underrated line: "this issue is NOT about…" Then context and links to earlier discussions, the LOCI roles, and a deadline.

Then a proposal: one answer, or options to choose between. And finally, questions aimed at specific people, to confirm or refute specific assumptions. So the issue isn't a message in a bottle. But a written debate can drag just as badly as a spoken one. So there are rules.

Be concise. They quote Boileau: "What is well conceived is clearly stated." If you can't write it simply, you're not actually sure of it yet. Then the "So what?" test.

If the implication of your comment isn't obvious, spell it out. For the Owner, the follow-up matters as much as the opening. They keep everyone on the million-dollar question, the one sticking point that actually matters, not the details. They recap what's been agreed and what's still open. And Slack reminders are a last resort, for overdue contributions or genuine urgency.

Owners hide comments that don't move things forward. And everyone is expected to know GitHub's formatting: headings, footnotes, tables, keyboard shortcuts. Because in writing, form carries almost as much as substance.

Two rules stop all this from turning into decision by committee. First, the Owner decides as what Alan calls an "enlightened despot". They investigate ideas, measure risks, question peers. But they don't seek consensus. And they don't have to implement everything they're told.

Alan is blunt: it's not a democracy. Every employee is a shareholder, and the company's interest comes before the team's, or the individual's. When the Owner is reasonably sure of the right bet, they decide. Everyone tries it. And once the impact is visible, they review whether it was the right call.

Second, the number of contributors is controlled. Jeff Bezos' two-pizza rule applies to async work too. The more people on an issue, the less each one contributes. Past about six contributors, the spectator effect kicks in, and the quality of participation drops. Even notifications follow this idea.

Everyone is trusted to set up their own, so direct tags in the questions are kept to a minimum.

Alan doesn't claim this is the best system, or the only one. Just the one that fits them. Fewer interruptions. Less spectator effect. And decisions made with a step back, and the facts written down.

I'm not about to move every decision my team makes into GitHub issues. But the template is going straight into our repo. I've written it up as a GitHub issue template, so it's offered every time someone opens a new issue. The sections are Alan's. The LOCI lines and the label are my additions.

It's a decision issue, with its own label. It opens with the scope: the goal, and what it's NOT about. Then why I'm opening it. Then the LOCI roles, a timeline for contributions and the decision, the context, the proposal, and the questions.

If you're thinking about GitHub for project management more broadly, Issues and Projects do different jobs. Issues hold the discussion and, once closed, the decision. A Project is a board or table laid over issues from one or more repositories, with your own fields, like status, owner or deadline. For a decision forum like Alan's, labels and the issue list are enough. Add a Project when you want every open decision on one screen, sorted by when it has to be made.

Or when delivery work moves in too. That's where most teams end up using both. In the end, it comes down to this. You can never fully explain a meeting to someone who wasn't there. But anyone can read a decision.

The full post, with Alan's original article and the template to copy, is on jared.lynskey.co.nz.

More videos

Claude Code Worktrees: Running Parallel Agents Without Collisions

Cloudflare 520, nginx 499 and Postgres Stalls: Keeping Webhooks Alive

pytest-testmon: Run Only the Tests Affected by Your Code Change

Replacing My Self-Hosted Expo Update Server with Codemagic Patch